Open Top 40' HC

Open Top 40' HC

This equipment is proper for overheight cargoes due to the fact that its roof is covered with tarpaulin. Its door header is removeable to provide easier stuffing.

Please reach your customer representative for your over-height cargoes

● The specifications which are presented here might vary and information on equipment accepted as correct specifications. It was set to be an example that’s why please contact our customer service to learn any exact values.

Max Gross Weight
Tare
Maximum Carrying Weight
Internal Volume
Inner Height
Inner Length
Inner Width
Inner Width Between Panels
Inner Width Between Rails
Door Height
Door Width
Ceiling Opening Length
Ceiling Opening Width
Length Between Posts
Width Between Posts
Platform Length
Platform Width
Height with Lids Closed
Heat Control
Humidity Control
Ventilation Value
30480 Kg
4300 Kg
26180 Kg
75,55 cbm
2672 mm
12030 mm
2350 mm
-
246 - 257 mm
2582 mm
2338 mm
11.871 mm
2190 mm
-
-
246 - 257 mm
246 - 257 mm
-
-
-
-
67196,952 Ibs
9479,885 Ibs
57717,067 Ibs
2666,257 cuft
105,197 inch
473,622 inch
92,520 inch
-
246 - 257 inch
101,654 inch
92,047 inch
467, 362 inch
86,220 inch
-
-
246 - 257 inch
246 - 257 inch
-
-
-
-
Turkey's Largest Container Ship on the Way

Turkey's Largest Container Ship on the Way

The First Block of the Vessel, whose Steel Cutting was Performed in July, Takes its Place in the Dry Dock... Another significant step has been taken in the order of 2 units of 4,012 TEU container ships placed by Turkon Line to further enhance its service quality.

Packaging Material, Plastic Products & Scrap

Packaging Material, Plastic Products & Scrap

Plastic products play an important role in the production processes of many industries as raw materials. In addition, the product of packaging material has a very wide market as an industry.

Demurrage

Demurrage

If the containers supplied by the carrier are not returned to the carrier after being unloaded by the consignee within the free time specified in the tariff, the delay fee which the carrier has the right to demand from the consignee or the shipper in accordance with the provisions of the bill of lading, and which is processed for each day of delay, is called “container demurrage”.

SHARE
TRACKING
TRACKING
You can track every stage of your container here.
DEPARTURE & ARRIVAL
DEPARTURE & ARRIVAL
You can access up-to-date vessel schedules.

CONTACT US
CONTACT US
You can find the contact information of our Regional, Country Offices and Agencies here.